Permits for Shower Work

What Washington, California and Florida require of contractors and permits before a shower job starts, sourced to each state's own pages.

Why this varies by state and city

Whether your shower job needs a permit generally comes down to whether it touches plumbing, changes the shower's footprint, or alters framing, not just how much it costs. Your city or county building department applies its own inspection schedule on top of the state's contractor rules, so the same job can move faster in one city than another.

Washington

Washington layers a paperwork step on top of registration. On residential work at $1,000 or more for a property of four units or fewer, the contractor owes you a signed notice ahead of day one that spells out their bond and registration number and warns, in writing, that a subcontractor or supplier left unpaid can still place a lien against your home.[1]

That notice requirement exists apart from whatever permit your city requires, so expect two separate pieces of paperwork on a Washington shower job: the state's notice and the local building permit.

California

California sets a low bar for when a state license kicks in: needing a permit, putting an employee on the job, or a combined labor-and-materials price of $1,000 or more each trigger it on their own. A shower job trips at least one of those three in almost every case.[2]

For a single-trade shower job, the state points homeowners toward a contractor licensed in that specific trade, tile or plumbing, rather than a general building contractor, though a general contractor can take on a project that spans more than two trades.[2]

Florida

Florida puts a clock on deposits. Once a contractor collects more than a tenth of the contract price up front on residential work, two deadlines start: permits have to be filed within 30 days, and the crew has 90 days from permit issuance to break ground, unless just cause applies or you signed off in writing on a longer wait.[3]

That rule is one reason a Florida shower quote often lists a permit-filing date separately from a start date. If your contractor took a deposit weeks ago and hasn't filed for a permit yet, that timeline is worth asking about directly.

What a permit actually checks

An inspector isn't grading the tile pattern. A plumbing inspection confirms the valve, drain and vent tie in correctly and hold pressure; a framing or rough-in inspection, when the job involves one, confirms blocking and waterproofing are in before they get covered up by tile or panels.

Skipping a required permit doesn't just risk a fine. It can also complicate a home sale later, since a buyer's inspector or lender may ask for permit records on plumbing work that's visibly newer than the house.

Questions people ask

Does replacing just a shower door need a permit?

That's typically a lower bar than plumbing or framing changes, but it still depends on your local building department's rules; check with your city or county before assuming either way.

Who is responsible for pulling the permit, me or the contractor?

Usually the contractor, and in Florida the law sets a 30-day filing window and a 90-day start window once they've collected a deposit over 10% of the contract price.[3]

Does a state contractor license substitute for a local permit?

No. A state license, or a Washington registration, establishes who is allowed to contract for the work; a local permit is a separate approval from your city or county building department for the specific job.

What happens if a shower job is done without a required permit?

Beyond a possible fine from your local building department, unpermitted plumbing work can surface later during a home sale, when a buyer's inspector asks for records on anything that looks newer than the rest of the house.

Sources

  1. Register as a Contractor, Washington State Department of Labor & Industries, accessed 2026-09-30
  2. What Kind of Contractor Do You Need?, Contractors State License Board, accessed 2026-09-30
  3. Florida Statutes 489.126: Moneys received by contractors, Florida Legislature, accessed 2026-09-30