Top-Rated Shower Remodelers in Asbury Lake, FL
Asbury Lake's listed remodelers carry an average 4.8 rating across 569 combined Google reviews. That volume of reviews is what lets us weight the ranking fairly, rather than crowning whoever happens to have the single highest score. Before you sign anything, get a license or registration number from whichever one you choose and check it with the state.
Google Maps ratings checked · How we rank
Google's top-rated shower remodelers for Asbury Lake, FL
Ranked with review count pulling as much weight as the star average itself, so a handful of five-star reviews won't beat a long track record. This list doesn't check anyone's license: that step is still yours, so look up the license or registration number yourself and clear it with the state first.
| Rank | Business | Google rating | Reviews | Category | Area | Google Maps listing |
|---|---|---|---|---|---|---|
| 1 | House Perfected llc | 154 | Bathroom remodeler | Fleming Island 32003 | Google reviews | |
| 2 | P Dillon Remodeling Direct, Inc. | 153 | Bathroom remodeler | Not listed | Google reviews | |
| 3 | BLP Renovations LLC & Kingsley Kitchens | 233 | Bathroom remodeler | Orange Park 32065 | Google reviews | |
| 4 | Mario's Home Pro Services Inc. | 21 | Bathroom remodeler | Not listed | Google reviews | |
| 5 | Assist2Build Inc. | 3 | General contractor | Middleburg 32068 | Google reviews | |
| 6 | A Specialty Home Design | 5 | Construction company | Fleming Island 32003 | Google reviews |
Questions to ask before you hire
- Which part of this job is licensed plumbing work, and which is tile or finish work?
- Will you pull the permit, and can I see the permit number once it's issued?
- What brand and model of shower valve will you install, and is it a pressure-balance or thermostatic type?
- Who installs the waterproofing before tile goes on, and what product do they use?
- How many days will the bathroom be out of use?
- What happens to the price if the crew finds rot or damage once the old shower comes out?
- Is the bid a fixed price or a time-and-materials estimate?